Healthcare maintenance software: safety-critical checks stay visible until they are done
Maintain clinical equipment and critical infrastructure on schedules that pass inspection. Every check records who did it, when, with the evidence, and exports as an inspection-ready pack.
What a hospital needs from a CMMS
Four things that decide whether an inspection finds a record or a gap.
Checks that cannot slip
Safety-critical checks stay visible until they are completed.
Evidence on every job
Who did what and when, with photos, readings and sign-off.
Inspection-ready exports
History exports as a pack, so audits become reports rather than paperwork searches.
Critical plant covered
Medical gas, imaging, backup power, air handling and sterilisers.
Protect patients, staff and facilities
Schedule preventive work for clinical equipment and critical infrastructure, with a checklist for each check, so an inspection finds a record and not a gap.
- Schedules for clinical equipment and plant
- A checklist for every safety-critical check
- One view of what is due and what is overdue
- Medical gas
- Imaging
- Backup power
- Air handling
- Sterilisers
Prove it was done, in one export
Each work order logs who did what and when, with photos, readings, and sign-off. History exports, so audits become reports rather than paperwork searches.
- Who completed each check, and when
- Photos, readings and sign-off attached
- An inspection-ready pack on demand
NeoGen records and exports the evidence. Which standards apply is for your compliance team to decide.
Audits & complianceOne queue for every fault
Requests can be raised from any device with a photo, then triaged by priority, site and asset in one queue. External contractors are planned alongside in-house staff.
- Raise a request from any device, with a photo
- Triaged by priority, site and asset
- Contractors planned next to your own team
Try it on a hospital. Three things your team does daily.
Complete a safety check, raise a fault from the ward, look up an asset's history. Sample site, real behaviour.
Sample site, checks and history for illustration only. Actual checks and due dates are set with you per site.
How much time does audit preparation take?
Enter your own numbers. The share of time saved is your assumption, not a promise.
Simple arithmetic from your inputs, for illustration. It is not a forecast of results.
Start with the equipment that must not fail
No big-bang cutover. Tap a step to see what it involves.
Part of the same maintenance system
The rest of NeoGen, for the people and systems around the equipment.
Ready to keep your safety checks on schedule?
Book a personalised demo and we'll set up a sample site around your critical equipment.
Book a demo No obligation. Just 30 minutes of your time.Healthcare FAQs
It keeps safety-critical checks (life safety, ventilation, clinical equipment) visible until completed, records who completed each check with evidence, and exports an inspection-ready pack. Your compliance team decides which standards apply. See audits and compliance.
Your compliance team decides which standards apply to you. NeoGen keeps the safety-critical checks visible, records who completed each one with evidence, and exports an inspection-ready pack. For specific requirements, we go through them with you on the call.
No. It is one product. Setup varies (asset hierarchy, preventive schedules, checklists), and NeoGen configures these with each customer instead of selling sector editions.
Start with critical assets and key preventive schedules. Real work orders can run within days, and the rest of the estate gets added over time. See implementation.
Yes. Assets, work, and stock are organised by site, with site-specific schedules and teams. Shared definitions keep cross-estate reporting comparable. See enterprise.
Yes. Requests can be raised from any device with a photo, then triaged by priority, site, and asset in one queue. External contractors are planned alongside in-house staff. See resource planning.
Yes. Mobile equipment is tracked as an asset, with location updated as it moves. Servicing can be triggered by run hours, cycles, or distance rather than the calendar.
Typically plant alarms from a building management system come in as work requests with the asset attached, and sensor readings are written against the asset. Each connection runs in one stated direction and is logged. The named systems depend on your stack, so we confirm what connects on the call. See integrations.
See NeoGen set up for your hospital or clinic
A 30-minute call on your critical equipment, statutory checks and evidence.
- Set up around your critical equipment
- Real work orders within days
- No credit card required
- No obligation
